EV Charging Infrastructure Division

Washington, DC & Maryland

A and E Construction LLC coordinates EV charging construction and site development from initial assessment through electrical make-ready, civil work, installation, commissioning and long-term support. We help owners turn a charging concept into a buildable site plan, then manage the field work and handoffs needed to put equipment into service.

Core Services

A and E coordinates the following construction and delivery work for EV charging projects:

  • EV site assessments and feasibility
  • Electrical make-ready
  • Utility coordination
  • Underground conduit and trenching
  • Concrete pads, pedestals, and bollards
  • Signage, striping, and parking modifications
  • Level 2 charging infrastructure
  • DC fast-charging make-ready
  • Network integration
  • Testing, commissioning, and turnover
  • Preventive maintenance and expansion
  • General contractor field execution

EV Site Assessment & Feasibility

Start with the property, not a charger catalog. We review the proposed parking layout, access, existing electrical service, potential equipment locations, trench routes and phasing. A site assessment helps identify utility, permitting and construction questions before a final scope is set.

Electrical Make-Ready & Utility Coordination

Coordinate service capacity, distribution equipment, panel work, metering and the utility interface with the design and electrical teams. The make-ready scope is tailored to the selected equipment and the site's available power.

Underground Conduit, Trenching, Concrete Pads & Bollards

Build the physical path and protected mounting locations for reliable charging: excavation, conduit, restoration, equipment pads, pedestals, bollards, signage and parking modifications as the site requires.

Level 2 & DC Fast-Charging Infrastructure

Support workplace, residential, destination and fleet charging programs, including Level 2 installation and DC fast-charging make-ready. Charger choice and power requirements are confirmed during project design.

Charger Installation, Energization & Commissioning

Coordinate equipment placement, electrical connection, inspection, utility energization, functional testing, network activation and owner turnover with the responsible licensed trades and equipment partners.

Preventive Maintenance & Expansion

Plan for access, serviceability and future stalls while building the first phase. A and E can coordinate inspections, repairs and expansion work as charging needs change.

Fleet, Multifamily, Dealership, Parking, Retail, Hotel and Commercial Applications

Different sites call for different operating plans. Fleet depots may need overnight charging and staged expansion; multifamily properties may require shared access and billing coordination. Dealerships, parking facilities, retail centers, hotels, fuel and convenience sites, commercial properties and public facilities each have their own traffic, protection and uptime needs.

A and E EV Delivery Process

  1. Assess
  2. Design
  3. Make-Ready
  4. Build
  5. Install
  6. Energize
  7. Commission
  8. Maintain

We align scope, utility readiness, civil and electrical sequencing, installation and close-out so owners can track decisions and responsibilities at each stage.

Technical Performance Range

These figures describe the representative Level 2 equipment range in A and E’s capability statement. Final charger specifications and compatibility depend on the equipment selected and engineered site design; DC fast-charging equipment is scoped separately.

Representative Level 2 charger technical performance range
Input Voltage208 / 240 VAC
PhaseSingle-phase
Charging Current16A–80A
Charging Output3.8 kW–19.2 kW
ConnectorSAE J1772 Type 1
MountingWall or Pedestal
CommunicationsWi-Fi / Ethernet / LTE
Network ProtocolsOCPP 1.6J / OCPP 2.0.1
EV CommunicationsISO 15118
Outdoor ProtectionNEMA 3R / NEMA 4
Access & PaymentRFID, NFC, App or Free-Use
Remote OperationCloud Portal / Dashboard

EV Charging Contractor for Washington, DC and Maryland

A and E brings general contractor field execution and coordinated trade partners to EV work across its DC and Maryland service area. The company lists DC CBE, LBE, SBE, MBE/DBE and SAM registration, DC and Maryland licensing, and bonding of $3 million single / $6 million aggregate in its EV capability statement. Request current documentation for procurement review.

Planning Details That Shape Your Project

Site conditions, charger selection, utility capacity, permits and network requirements determine the final design. For an assessment conversation, share the property address, planned number of charging spaces, preferred charging speed, any existing electrical drawings and your target opening date.

Request an EV Site Assessment

Tell us where charging is planned and what the site needs to accomplish. We will discuss the next practical steps for scoping construction and utility coordination.

Describe your site Call (202) 746-0659

Public EV Project Outlook

Commercial, multifamily, fleet and public-sector owners are evaluating charging as part of facility improvements and new construction. Each opportunity still depends on site feasibility, owner approvals, utility coordination and funding. Ask A and E about a specific site to move from a general idea to a defined scope.

Request an EV Site Assessment

Share a few details and we will follow up about the project scope.

Loading
Your request has been sent successfully. Thank you!